The Drilling
Information is the Key to Success.
P&F drilled the first well Thompson #1, in September 2019. In November 2019 we drilled and cored Thompson #2 and Longboat #57/1.
All the wells gave a stunning logs, better than expected.
We spent the winter months studying the core and subsequently developed an incredible proprietary product to be utilized during the pumping phase and future drilling which will greatly enhance overall recovery.